Quncheng Automation
Water-Treatment Component Reliability Testing

Inspection & Laboratory Systems · Water Treatment

Water-Treatment Component Reliability Testing

A modular test platform for filter cartridges, booster pumps, valves and integrated waterways under performance, endurance and extreme-condition tests.
PROJECT TYPEInspection & Laboratory SystemsINDUSTRYWater TreatmentENGINEERING FOCUSComponents · Endurance · Extreme conditions
01 · PROJECT PROFILE

Application and equipment

Application

A modular test platform for filter cartridges, booster pumps, valves and integrated waterways under performance, endurance and extreme-condition tests.

Main scope

Filter air-tightness and vacuum · Booster-pump performance · Valve air-tightness · Integrated waterway testing · Endurance testing · Water-hammer, pressure and burst tests

02 · SYSTEM SCOPE

Test items and equipment scope

We integrate the following equipment, stations and interfaces around your product and process requirements.

01Filter air-tightness and vacuum

Test item / equipment module

02Booster-pump performance

Test item / equipment module

03Valve air-tightness

Test item / equipment module

04Integrated waterway testing

Test item / equipment module

05Endurance testing

Test item / equipment module

06Water-hammer, pressure and burst tests

Test item / equipment module

03 · TECHNICAL PROFILE

Equipment configuration and test requirements

01Applicable componentsFilter cartridges, booster pumps, check valves, solenoid valves, switches, flowmeters, RO membranes and piping assemblies
02Performance testsRated flow, pressure, current, shut-off and suction
03Reliability testsAir-tightness, vacuum, endurance, water hammer, pressure resistance and burst
04ConfigurationModular media, station count, range, accuracy and data interfaces
04 · PROJECT GALLERY

Our equipment and production systems

Production equipment, workstations and system interfaces.

Component Reliability Test — project view 1
Component Reliability Test — project view 1
Component Reliability Test — project view 2
Component Reliability Test — project view 2
Component Reliability Test — project view 3
Component Reliability Test — project view 3
DISCUSS A SIMILAR PROJECT

Start with your product, process and verification target

Share the product structure, target takt, test requirements, site layout and required interfaces. We will work with you on the equipment configuration and delivery scope.

Discuss project requirements →