Filter Cartridge Assembly and Leak Testing Line

Automation Production Lines · Water Treatment

Filter Cartridge Assembly and Leak Testing Line

We integrate filter cartridge loading, ultrasonic and spin welding, leak testing, vision inspection, RFID identification and packaging in one automated line.
PROJECT TYPEAutomation Production LinesINDUSTRYWater TreatmentENGINEERING FOCUSSpin welding · Leak testing · Vision · RFID
01 · PROJECT PROFILE

Application and equipment

Application

We integrate filter cartridge loading, ultrasonic and spin welding, leak testing, vision inspection, RFID identification and packaging in one automated line.

Main scope

Automatic loading · Ultrasonic welding · Rotary welding · Air-tightness testing · RFID identification · Visual appearance inspection

02 · SYSTEM SCOPE

Stations and system scope

We integrate the following equipment, stations and interfaces around your product and process requirements.

01Automatic loading

Station / system module

02Ultrasonic welding

Station / system module

03Rotary welding

Station / system module

04Air-tightness testing

Station / system module

05RFID identification

Station / system module

06Visual appearance inspection

Station / system module

07Packaging and line-off

Station / system module

03 · TECHNICAL PROFILE

Equipment configuration and test requirements

01ApplicationWe integrate filter cartridge loading, ultrasonic and spin welding, leak testing, vision inspection, RFID identification and packaging in one automated line.
02System scopeAutomatic loading · Ultrasonic welding · Rotary welding · Air-tightness testing · RFID identification · Visual appearance inspection · Packaging and line-off
03Delivery focusSpin welding · Leak testing · Vision · RFID
04 · PROJECT GALLERY

Our equipment and production systems

Production equipment, workstations and system interfaces.

Filter Cartridge Smart Line — video 1
Filter Cartridge Smart Line — project view 2
Filter Cartridge Smart Line — project view 2
DISCUSS A SIMILAR PROJECT

Start with your product, process and verification target

Share the product structure, target takt, test requirements, site layout and required interfaces. We will work with you on the equipment configuration and delivery scope.

Discuss project requirements →